RACKSTORMobile Shelving UK

Case Study

Heavy-Duty Mobile Storage Installation in Oxfordshire

Oxfordshire · Commercial Storage

Storage-Equipment Principal Contractor mobile shelving project, Oxfordshire — image 1
Storage-Equipment Principal Contractor mobile shelving project, Oxfordshire — image 2
Storage-Equipment Principal Contractor mobile shelving project, Oxfordshire — image 3
Storage-Equipment Principal Contractor mobile shelving project, Oxfordshire — image 4
Storage-Equipment Principal Contractor mobile shelving project, Oxfordshire — image 5

The Challenge

Rackstor UK Ltd carried out this Oxfordshire project as a subcontract installation for a storage-equipment principal contractor. The work centred on a heavy-duty base-and-rail mobile shelving system designed to make maximum use of the available floor area while providing high-capacity storage for heavier materials. The principal contractor has intentionally not been named.

The Solution

The installation team fitted and aligned the heavy-duty floor rails, constructed the mobile base system, and levelled and commissioned the mobile carriages. Heavy-duty shelving was then installed, with each storage level adjusted and aligned. The completed system underwent operational and safety checks followed by a final inspection.

The Result

The completed installation created approximately 100 linear metres of high-capacity storage. It makes maximum use of the floor area, provides flexible adjustable shelving, improves stock organisation and gives the site smooth, reliable mobile-base operation in a durable long-term storage solution.

Project FAQs

Oxfordshire installation questions

What type of mobile shelving was installed in Oxfordshire?

A heavy-duty base-and-rail mobile shelving system with heavy-duty shelving was installed for this Oxfordshire project.

How much storage capacity did the installation create?

The completed system created approximately 100 linear metres of high-capacity storage.

What work was included in the installation?

The work included floor-rail installation and alignment, mobile-base construction, carriage levelling and commissioning, shelving installation, storage-level adjustment, operational and safety checks, and a final inspection.

Who was the installation completed for?

Rackstor UK Ltd completed the work as a subcontract installation for a storage-equipment principal contractor. No third-party company name is disclosed.

See how we can help your organisation

Call 0800 654 6955, email office@rackstor.co.uk or request a free survey for a mobile shelving installation.