Mobile Shelving Relocation — Nuffield Health, Oxfordshire

Oxfordshire · Healthcare

Nuffield Health mobile shelving project, Oxfordshire — image 1
Nuffield Health mobile shelving project, Oxfordshire — image 2
Nuffield Health mobile shelving project, Oxfordshire — image 3

The Challenge

Nuffield Health's Oxfordshire facility had 80 bays of existing mobile shelving that had reached the end of its operational life on the original floor tracking system. The floor tracks, bases and carriages had deteriorated to the point where the system was no longer operating safely or efficiently — but the shelving units themselves were in excellent condition and represented a significant asset. The challenge was to replace the failed mechanical components and restore the system to full working order without the cost and disruption of a complete new installation. With patient records and clinical files requiring continuous access, the project demanded careful phasing to avoid disrupting clinical operations.

The Solution

Rackstor UK Ltd dismantled all 80 bays of existing shelving, installed brand new floor tracks, bases and carriage mechanisms, and reinstalled the existing shelving units on the new mechanical system. This approach delivered significant cost savings compared to a full replacement while giving Nuffield Health an effectively new mobile shelving system. New precision-engineered floor tracks were installed and levelled to BS EN 15095 tolerances. New carriage bases and wheel assemblies were fitted, restoring smooth low-effort operation. All safety systems were tested and certified before handover.

The Result

All 80 bays were returned to full operation with a completely renewed mechanical system. The new tracks, bases and carriages restored effortless single-handed operation across the full system. The project was completed with minimal disruption to clinical operations through careful phasing and out-of-hours working where required.

See how we can help your organisation

Call 0800 654 6955, email info@rackstor.co.uk or request a free survey for a mobile shelving installation.

More case studies

Mobile Shelving Installation — Central London Hotel Basement

Central London

Mobile Shelving Installation — Central London Hotel Basement

A bespoke mobile shelving system installed in the basement of a Central London hotel — 10 bays creating 57 linear metres of storage on mobile bases requiring only one access aisle.

Mobile Shelving Installation — 36 Bays, Berkshire (Healthcare)

Berkshire

Mobile Shelving Installation — 36 Bays, Berkshire (Healthcare)

A subcontract installation of 36 bays of single-skin Delta shelving mounted onto a Rackstor mobile shelving base for a healthcare organisation in Berkshire.

Heavy-Duty Mobile Storage Installation in Oxfordshire

Oxfordshire

Heavy-Duty Mobile Storage Installation in Oxfordshire

A subcontract heavy-duty base-and-rail mobile shelving installation creating approximately 100 linear metres of high-capacity storage in Oxfordshire.

NHS Trust, Reading — New Mobile Shelving Installation

Reading, Berkshire

NHS Trust, Reading — New Mobile Shelving Installation

New manual mobile shelving in an NHS outbuilding — maximised storage capacity in a compact footprint.

Storage & Removal Company, Durham — Heavy Duty Mobile Shelving

Durham

Storage & Removal Company, Durham — Heavy Duty Mobile Shelving

Large chassis heavy duty mobile shelving for high-density box storage — maximising revenue per square metre.

British Army — 120 Linear Metres of High-Density Mobile Shelving

Southern England

British Army — 120 Linear Metres of High-Density Mobile Shelving

24 bays of single skin Delta shelving on Rackstor Module R mobile bases with raised chipboard floor and aluminium access ramp — approximately 120 linear metres of secure storage.

Sea Life Centre, Tenerife — 576 Linear Metres of High-Density Archive Storage

Tenerife, Canary Islands, Spain

Sea Life Centre, Tenerife — 576 Linear Metres of High-Density Archive Storage

Rackstor Module R mobile shelving delivering 576 linear metres of organised office filing and archive storage at the Sea Life Centre in Tenerife.